Waste Water Management – quick update

Just a quick update to let you know what’s “happening”.    We have had the soil tested and received that report.

Now we wait for the report from the engineer/designer who actually designs the system.   It is supposed to take 2-3 weeks,  but I don’t have much faith in that.

 